Ravenbrook / Projects / Perforce Defect Tracking Integration / Version 0.4 Product Sources / Design

Perforce Defect Tracking Integration Project


Replicator interface to TeamTrack

Gareth Rees, Ravenbrook Limited, 2000-09-13

1. Introduction

This document describes the implementation and configuration of the replicator interface to TeamTrack.

The purpose of this document is to make it possible for people to maintain the interface to TeamTrack.

This document will be modified as the product is developed.

The readership of this document is the product developers.

This document is not confidential.

[This document is a placeholder. We've decided not to document the structure of these until they've settled down a bit. RB 2000-10-04.]

A. References

[RB 2000-10-05] "P4DTI Project Design Document Procedure"; Richard Brooksby; Ravenbrook Limited; 2000-10-05.
[RB 2000-08-30] "Design document structure" (e-mail message); Richard Brooksby; Ravenbrook Limited; 2000-08-30.

B. Document History

2000-09-13 GDR Created based on [RB 2000-08-18] and [RB 2000-08-30].
2000-10-05 RB Updated reference to design document procedure [RB 2000-10-05] to point to on-line document. Added placeholder comment.

Copyright © 2000 Ravenbrook Limited. This document is provided "as is", without any express or implied warranty. In no event will the authors be held liable for any damages arising from the use of this document. You may make and distribute copies and derivative works of this document provided that (1) you do not charge a fee for this document or for its distribution, and (2) you retain as they appear all copyright and licence notices and document history entries, and (3) you append descriptions of your modifications to the document history.

$Id: //info.ravenbrook.com/project/p4dti/version/0.4/design/replicator-teamtrack-interface/index.html#2 $

Ravenbrook / Projects / Perforce Defect Tracking Integration / Version 0.4 Product Sources / Design